docs(07-02): complete Mentor Flow E2E Testing plan

Tasks completed: 3/3
- Archive access control and display verification
- Job detail page and application form verification
- Notification opt-in system verification

All tests PASSED with zero issues found. Mentor workflow fully functional.

SUMMARY: .planning/phases/07-testing-polish/07-02-SUMMARY.md
This commit is contained in:
2026-01-29 11:20:35 +09:00
parent c1eedcb0b7
commit 32ab4d3262
2 changed files with 301 additions and 11 deletions

View File

@@ -10,18 +10,18 @@ See: .planning/PROJECT.md (updated 2026-01-14)
## Current Position
Phase: 7 of 7 (Testing & Polish)
Plan: 1 of 2 in current phase
Status: In progress
Last activity: 2026-01-29 — Completed Plan 07-01 (Provider Flow E2E Testing)
Plan: 2 of 2 in current phase
Status: Phase complete
Last activity: 2026-01-29 — Completed Plan 07-02 (Mentor Flow E2E Testing)
Progress: ████████████░ 68%
Progress: █████████████ 72%
## Performance Metrics
**Velocity:**
- Total plans completed: 17
- Average duration: 8.5 min
- Total execution time: 2.37 hours
- Total plans completed: 18
- Average duration: 9 min
- Total execution time: 2.87 hours
**By Phase:**
@@ -33,11 +33,11 @@ Progress: ████████████░ 68%
| 4 | 2 | 13 min | 6.5 min |
| 5 | 4 | 7 min | 1.75 min |
| 6 | 2 | 2 min | 1 min |
| 7 | 1 | 25 min | 25 min |
| 7 | 2 | 55 min | 27.5 min |
**Recent Trend:**
- Last 5 plans: 05-02 (3 min), 05-03 (2 min), 06-01 (1 min), 06-02 (1 min), 07-01 (25 min)
- Trend: Plan 07-01 was manual UAT testing (higher time investment expected)
- Last 5 plans: 05-03 (2 min), 06-01 (1 min), 06-02 (1 min), 07-01 (25 min), 07-02 (30 min)
- Trend: Plans 07-01 and 07-02 are manual UAT testing (higher time investment expected)
## Accumulated Context
@@ -90,6 +90,7 @@ Recent decisions affecting current work:
| 05-02 | Provider email sourced from ACF field job_contact_email | Uses established field from Phase 01-03, maintains data consistency |
| 07-01 | Provider workflow testing revealed core functionality works | Registration, submission, editing, deactivation all function correctly |
| 07-01 | Three UX/notification issues documented as non-blocking | Issues are polish items, not functional blockers for production |
| 07-02 | Mentor workflow testing revealed zero issues | Archive access, job application, and notification opt-in all function perfectly |
### Deferred Issues
@@ -115,5 +116,7 @@ Three UX/notification issues found (non-blocking, recommended fixes):
## Session Continuity
Last session: 2026-01-29
Stopped at: Completed Plan 07-01 (Provider Flow E2E Testing) - Phase 7 in progress
Stopped at: Completed Plan 07-02 (Mentor Flow E2E Testing) - Phase 7 complete (2/2 plans done)
Resume file: None
**Phase 7 Status:** Testing complete - all provider and mentor workflows validated with minimal issues found